Maintenance and Upgrades

Records for any of the following (yard bills, project pictures) available upon request:

  • Full interior cleaning, including removal of plywood below settees/berths to clean dirt accumulated in hard-to-reach spots
  • Deep cleaning of all interior cushions with Rug Doctor
  • Hull sanded and buffed to remove stains and restore gloss
  • Replaced gooseneck screws
  • Replaced cracked rubber boot on bilge pump
  • Replaced batteries, installed solar panel
  • Replaced most of the running rigging:
    • Topping lift: climbed up mast to install block, added 70 ft. of 1/4 Sta-Set
    • Jib halyard: replaced with 85 ft. of 3/8 Sta-Set X
    • Mainsheet: replaced with 75 ft. of 7/16┬áRegatta Braid
    • Jib sheet: replaced with 35 ft. of 3/8 Regatta Braid
    • Installed Cunningham / reefing hook
    • Added control lines (5/16 Sta-Set) and hardware (cheek blocks, cleats) for two reef points on boom
    • Replaced cam cleat with Spinlock for jib sheet
    • Spliced all new lines
  • Engine:
    • New 1″ stainless steel prop shaft, cutlass bearing and dripless seal
    • Replaced low-pressure fuel line (filter to pump)
    • Added freshwater flushing system
    • Replaced injection pump (August 2013)
    • Replaced exhaust riser, manifold, muffler, exhaust hose to transom, impeller (March 2017)
  • Disassembled and cleaned all winches
  • Re-wired mast with proper thru-deck connectors
  • Replaced brass in-line valves with bronze seacocks
  • Added tiller extension
  • Installed new stereo (with Bluetooth and USB connection / charger)
  • Added mid-rail cleats for spring lines
  • Disassembled, cleaned, painted with Cetol and re-installed teak eyebrows and handrails
  • Cleaned and painted rubrail and toerail with Cetol
  • Cleaned and painted pulpit, coamings, dorade box, companionway trim and other small pieces with Cetol
  • Repainted cabinets in the galley
  • Replaced old anchor with 22lbs Bruce
  • Mainsail reconditioned (leech rebuilt, all sail track slugs replaced)
  • Working jib reconditioned and foot re-cut
  • Deck bag for working jib reconditioned
  • Hauled out in September 2019:
    • 2 coats Interlux Ultra black
    • Replaced galley sink thru-hull, valve and fitting
    • Serviced all seacocks and valves
    • Replaced Groco HF pump assembly